SP
High-capacity four-screw screw press for sludge dewatering in an industrial hall
Solutions

Sludge Dewatering

Reduce sludge volume, lower disposal costs, simplify operations

Effective Sludge Dewatering

Sludge dewatering is the process of removing water from wastewater sludge to produce a semi-solid cake suitable for disposal or further processing. Effective dewatering directly reduces sludge volume by 80–95%, proportionally lowering transport and disposal costs. Screw press technology delivers continuous, reliable dewatering with minimal energy consumption, operator attention, and maintenance. The RF series covers dry solids loads from 6 to 1,664 kg DS/h, serving applications from small community plants to large industrial facilities.

Key Advantages

  • Volume reduction of 80–95% depending on feed and target cake solids
  • Continuous 24/7 operation without batch interruptions
  • Very low energy consumption: 0.02–0.1 kWh per m³ sludge
  • Compact installation footprint
  • Minimal operator attention required
Two-screw screw press with dewatered sludge cake discharge trough
RF Series Screw Press

Sludge Cake Discharge

The dewatered cake drops into a discharge trough — ready for a conveyor, container or skip.

Explore the RF series
Engineering Assessment

Ready to Find the Right Screw Press?

Our engineering team provides application-specific screw press sizing and selection — based on your sludge type, flow rate, and dewatering targets.