
Commercial
Screw Press RFQ
Prepare a request for quotation that gets an accurate answer
What to Include in Your RFQ
A good request for quotation (RFQ) lets suppliers size correctly and quote comparably. The more accurate your sludge and duty data, the more accurate and comparable the offers. If some data is unknown, a pilot test or jar test can establish it before final specification.
RFQ checklist
- Sludge type, origin and variability
- Feed solids (% DS) and daily solids load (kg DS/d)
- Operating hours and required throughput
- Target cake dryness and capture rate
- Materials, automation, and integration requirements
- Site constraints: space, power, existing equipment

RF Series Screw Press
Four-Screw Configuration
Two twin dewatering units on a common stainless steel frame — maximum throughput with a small footprint.
Explore the RF seriesEngineering Assessment
Ready to Find the Right Screw Press?
Our engineering team provides application-specific screw press sizing and selection — based on your sludge type, flow rate, and dewatering targets.