
Commercial
Screw Press Investment Cost
Understanding the upfront capital spend
What Makes Up Investment Cost
Investment (CAPEX) is the one-time spend to get a dewatering line running. Beyond the press itself, it includes polymer make-up and dosing, flocculation, feed pumps, cake conveyors, controls, and the civil, piping and electrical works to install them. A compact screw press typically has lower installation cost than large belt or centrifuge lines.
CAPEX Elements
Core Machine
Screw press sized to duty and materials
Polymer System
Make-up, dosing and flocculation
Ancillaries
Pumps, conveyors, controls
Installation
Civil, piping, electrical, commissioning

RF Series Screw Press
Compact Single-Screw Press
Entry-level unit for small treatment plants and industrial sites — inspection windows allow a view of the screw.
Explore the RF seriesEngineering Assessment
Ready to Find the Right Screw Press?
Our engineering team provides application-specific screw press sizing and selection — based on your sludge type, flow rate, and dewatering targets.