SP
High-capacity four-screw screw press for sludge dewatering in an industrial hall
Applications

Sludge Dewatering at WWTP

How sludge dewatering works at a wastewater treatment plant

Dewatering in the Sludge Line

Dewatering is the final volume-reduction step in the WWTP sludge line. After thickening and — at larger plants — digestion, sludge still contains 95–99% water. Mechanical dewatering with a screw press reduces this to a spadeable cake, cutting transport and disposal volume by up to 90%. The screw press sits downstream of the flocculation stage: conditioned sludge enters continuously, filtrate returns to the plant inlet, and dewatered cake drops to a skip or conveyor for disposal, composting or incineration.

The Dewatering Process Chain

  • Thickening reduces volume before dewatering
  • Polymer conditioning forms drainable flocs
  • Screw press separates filtrate from cake
  • Filtrate returns to the plant inlet
  • Cake is disposed, composted or incinerated
Two-screw screw press with dewatered sludge cake discharge trough
RF Series Screw Press

Sludge Cake Discharge

The dewatered cake drops into a discharge trough — ready for a conveyor, container or skip.

Explore the RF series
Engineering Assessment

Ready to Find the Right Screw Press?

Our engineering team provides application-specific screw press sizing and selection — based on your sludge type, flow rate, and dewatering targets.